In-company training and customized programs

We accelerate your teams' capabilities with hands-on training, professional software, and reusable project deliverables. We design customized roadmaps for construction companies, engineering firms, utilities, real estate, data centers, manufacturers, dealerships, and public administrations.

Value proposition .

Learning by doing: each module ends with an operational deliverable (model, calculation, plan, dashboard, script, procedure) ready to be used in your CDE/PMO.

Practicing teachers: active professionals (BIM, PM, MEP, OT/SCADA, railways, hydraulics, structures, ESG).

Measurable impact: we define KPIs before starting (productivity, quality, rework, safety, footprint/ESG) and measure improvement.

How we work (6-step process).

  • 30–45 minute meeting with HR/PMO/Operations.
    • We collect objectives, active projects, stack, and restrictions.
    • Output: brief and preliminary scope.
  • Interviews with technical experts, sampling of deliverables and workflows.
    • Gap matrix (skills/roles) and module map.
    • Output: program proposal (objectives, content, workload, schedule, KPIs, evaluation, budget).
  • Small cohort (12–20 people), 1–2 key modules.
    • Adjustments to pace, tools, and rubrics
    • Output: pilot report with improvements and scaling plan.
  • Delivery in weekly sprints.
    • Technical tutoring and clinics for specific questions.
    • Output: deliverables by team/role and progress dashboard.
  • Evidence assessed using rubrics; GUTEC in-company badge/certificate.
  • Output: report of results and recommendations.
  • Review of business KPIs (productivity, rework, safety, ESG).
  • Output: ROI report and suggestions for continuity (coaching, QA/PMO, microcredentials).
Transparencia

Suggested itineraries (customizable examples) .

  • BIM Essentials for construction and technical office (16–24 hours): CDE, naming, transmittals, basic BEP.
  • BIM MEP Coordination + Clash Detection (24–40 hours): MEP modeling, clash rules, issues, 4D/5D.
  • Scan-to-BIM / Drones & Thermography (16–24 hours): capture, clouds, recording, QA, thermal uses.
  • IFC & Interoperability (12–16 hours): open flows, validation, COBie/IDs.
  • Lean + Last Planner (16–24 Std.): Masterplan, Takt, PPC, Dashboards.
  • 4D/5D-Planung (20–30 Std.): Verknüpfung von Modell, Zeit und Kosten, EVA-Kontrolle.
  • Ansprüche, FIDIC/NEC und Dispute Boards (16–24 Std.): Abfassung, Nachweis, Verhandlung.
  • Kosten und Budgets (BC3) (16–24 Std.): Kostenstrukturen, Messungen, Änderungskontrolle.
  • Angewandte FEM (24–40 Std.): Modellierung, Lastannahmen, Überprüfung, Berichte.
  • Pathologie und Verstärkung (FRP/Vorgespannt) (16–24 Std.): Diagnose, Details, Qualitätssicherung.
  • Städtische Unterfangungen und Instrumentierung (16–24 Std.): Mikropfähle, Auskultation, Back-Analysis.
  • HEC-RAS/HMS + SWMM (24–40 h): Modellierung, Risikokartierung.
  • SUDS (16–24 h): Entwurf, Wartung, Fallbeispiele.
  • Städtische Entwässerung (16–24 Std.): Betrieb, Sensoren, Resilienz.
  • HVAC & Building Physics (24–32 h): cargas, eficiencia, commissioning.
  • Subestaciones & IEC-61850 (24–40 h): protección, automatización, pruebas.
  • SCADA/OT y Ciberseguridad (16–24 h): redes, amenazas, hardening.
  • Data Centers (24–32 h): Tier, redundancia, operación, pruebas integradas.
  • Eficiencia y NZEB retrofit (16–24 h): medidas, ROI, certificación.
  • ACV & Huella de Carbono (16–24 h): metodología y casos.
  • Compras responsables & Taxonomía UE (12–16 h): criterios y reporting.
Formación

Todos los itinerarios se adaptan a tu sector, normativa local y proyectos activos.

Deliverables and evaluation (what the teams take away).

  • Professional-grade deliverables per team/role:
  1. BEP/CDE + coordination templates.
  2. Coordinated MEP model with resolved issues.
  3. 4D/5D plan with EVA curve and WBS.
  4. FEM report with assumptions and verifications.
  5. HEC-RAS/SWMM model with scenarios.
  6. OT/SCADA procedures and risk matrix.
  7. Dashboard for costs/schedules (Power BI).
  • Rubrics with observable criteria: technical quality, coherence, traceability, presentation, and applicability
  • Mixed assessment: project + demo + technical Q&A; actionable feedback.

KPIs and ROI (how we measure impact) .

Productivity: ↓ hours per task (e.g., coordination/clash −25–40%).

Quality: ↓ rework/change orders (–10–20%).

Schedule: ↑ plan reliability (PPC +10–15 pts).

Safety: ↑ closure of preventive “observations” (+30%).

ESG: ↓ tCO₂e/deliverable (optimisation of travel, cloud, zero paper).

Satisfaction: ≥4.5/5.

Internal employability: % promotions/lead roles post-programme.

ROI Report at 30–60 days with results and recommendations

Example agenda (3-week hybrid)

Week 1 (online)

  • Day 1: Kick-off + objectives + CDE setup.
  • Day 2: Modelling/standards + mini-deliverable.
  • Day 3: Coordination/clash + issues and roles.

Week 2 (in person at a partner site)

  • Day 4: Intensive coordination workshop + 4D/5D.
  • Day 5: QA, pre-presentation, and corrections.

Week 3 (online)

  • Day 6: Metrics (EVA/ESG) + dashboard.
  • Day 7: Final demo + feedback + adoption plan.

Frequently Asked Questions (in-company).

Yes, we prefer real briefs; if there is sensitivity, we use anonymised or synthetic data.

Yes, with a badge/certificate and the option of a microcredential that can be recognised towards GUTEC master’s programmes (subject to equivalence).

Both: technical (BIM/MEP/FEM/HEC/IEC-61850/SCADA) and management (Lean, 4D/5D, claims, costs, ESG).

 
 
 

Yes: we define prior KPIs and deliver an ROI report. Short-stay visas (if the country requires them).

ES/EN; we adjust time slots for multi-country teams.

We adjust the sprint and reschedule the module/agenda with a minimum notice of 5 days.

Yes. We sign an NDA, implement access controls, and use approved repositories.

 
 
 
 
Scroll al inicio